Supply chain · Planning & control

Your flows.
A shared course.

One workspace for your demand forecast

Forecast demand, size your inventory, plan production and align your teams: Astrailio connects your ERP data, your models and your decisions, from a single item to the whole site network.

Try a DDMRP buffer

Demand moves.
The buffer adjusts.

Live
Service level100%
Weeks out of stock0
Average coverage22 d

Illustrative preview · one item, sample data

01 Use cases

From forecast to production order.
In a single model.

Each step reads the one before it: a forecast change updates buffers, recommended orders and line loading, with no exports and no rework.

01

Demand forecasting

A statistical forecast for every item: Astrailio tests the methods on your history (seasonal, Holt-Winters, Croston for intermittent demand) and keeps the most accurate one. Your teams adjust it, and the difference stays visible.

  • AUTO forecast
  • Backtest
  • Adjustments
02

DDMRP

Average usage, red, yellow and green zones, net flow, qualified spikes: recommended orders come straight out of the model, ranked by priority, and can still be corrected.

  • Buffers
  • Net flow
  • Recommended orders
03

Production and capacity

The load of orders on every line and bench, against capacity, with overload alerts. The plan flows back into DDMRP, allocated by urgency.

  • Load
  • Benches
  • Urgency
04

Multi-site network

Plants and branches in the same model: item classes calculated from usage, parameters by family and class, rules where the most specific one wins.

  • Multi-site
  • ABC classes
  • Rules
05

S&OP and scenarios

Actuals, statistical forecast and adjusted forecast in comparable versions, demand scenarios, and a Trail for every step of the cycle.

  • Versions
  • Scenarios
  • Trails
06

Performance tracking

Service level, coverage, stockouts, load: dashboards by role, a PDF Book for each site, and the day's priorities right on mobile.

  • Dashboards
  • Books
  • Mobile

02 In practice

Forecast. Prioritise.
Load.

Three screens your planners open every morning, shown here with sample data.

  • The right method for each item. Astrailio sets aside the latest season, tries each method and keeps the most accurate.
  • Today's priorities. Items ranked by net flow position, with the recommended order.
  • Load before overload. Every line against its capacity, week by week.
Item P07 · monthly salesSelected method: Holt-Winters
  • Seasonal14.2%
  • Holt-Winters8.7%
  • Croston21.5%

Error of each method on the season set aside: the most accurate is kept, item by item. Croston handles intermittent demand.

  1. P07Plant 0218%Red1,250
  2. P12Plant 0127%Red860
  3. P03Branch 0441%Yellow550
  4. P15Plant 0358%Yellow290
  5. P09Plant 0276%Green—
  6. P01Branch 0188%Green—

Net flow (on hand + on order − qualified demand) placed in the buffer: the lower it is, the higher the item's priority. The recommended order can still be corrected.

Line 3 · Assembly — load by weekOverload W42 · 112%

All lines · week 42

  • L1 · Machining76%
  • L2 · Painting91%
  • L3 · Assembly112%
  • L4 · Packing64%

Example: line 3 is loaded at 112% of its capacity in week 42.

The load of orders on every line and bench, compared with capacity: you see the overload before it happens.

03 Align

An S&OP cycle that moves forward.
Step by step.

Demand review, supply review, final decisions: a Trail links the steps of the cycle. Each step opens the right dashboard, on the right family or site, for the right person.

  • Two actions, no more. The planner submits the review; the manager approves it or returns it with a comment.
  • My tasks. Everyone finds their list and due dates as soon as they sign in.
  • Live progress. Who has submitted, who is waiting, what is left: visible to those in charge.

Trail · November S&OP

Step 1 · Demand review

Illustrative preview · sample data

04 Understand

Ask the question.
Anael searches your flows.

“Which items are at risk of a stockout?”, “Why is line 3 overloaded?”: in plain language, Anael queries the modules you have access to and cites its sources.

  • Within your access rights. Anael only sees what you see.
  • Answers you can check. Every figure links back to the module it came from.
AnaelAnalysis assistant

Which items are at risk of a stockout in the next 15 days?

3 items fall below their red zone before 7 November. The first has no order in progress:

  • P07 · Plant 02D+6
  • P12 · Plant 01D+9
  • P03 · Branch 04D+13

SourcesDDMRP · Net flowFirm ordersOpen orders

Illustrative preview · sample data

One platform, three functions

The same engine also serves
finance and HR.

The engine, Trails, Anael and governance

Let's talk about your flows

Stay on course.
Take the next step.